HUD 223(f) is a MAP application, not LEAN. It does not require three years of occupancy. Average physical occupancy must be at least 85% for the six months before application, maintained through endorsement. The application takes 6 to 12 months from start to closing. Bridge tenor should cover that lease-up plus the HUD timeline. Sponsors who don't budget HUD timeline force a bank or debt-fund mini-perm bridge between the value-add bridge and 223(f) close.
HUD 223(f) take-out: process speed, pricing, and the bridge-tenor implication
The trade vs. agency: HUD 223(f) typically delivers 25 to 75 bps tighter than agency on multifamily perm because of the 35-year amortization and the GNMA wrap. The cost is a 6 to 12 month execution timeline (vs. 60 to 90 days for agency) and full HUD documentation. Davis-Bacon does not apply to 223(f). Substantial rehab is 221(d)(4), which does require prevailing wages.
Bridge tenor implication: a sponsor planning to take out into 223(f) needs the bridge to cover lease-up to the Notice H 20-03 DSCR test, plus time for the MAP application and closing.
Sequencing playbook: use the bridge for rehab and lease-up until the six-month occupancy test and the DSCR test above are met, then file the MAP application. Bridge extensions typically run 25 to 50 bps per period; pricing them into the bridge underwriting at signing avoids surprise.
Sources
- Section 223(f): Refinance or Acquisition of Existing Multifamily · U.S. Department of Housing and Urban Development · current
- Apartment, Student Housing & Build-to-Rent Research · National Multifamily Housing Council (NMHC) · 2026-Q1
- Quarterly Survey of Commercial/Multifamily Mortgage Bankers Originations · Mortgage Bankers Association · 2026-Q1
